Airplanes DAR Ltd. Bulgaria
DAR 21 VECTOR II EXPERT VERSION
2008 E. ZARKOV
www.aeroplanesdar.com
1/32 SCALE DAR-21 VECTOR II Professional Version ASSEMBLY INSTRUCTION The proposed DAR-21 model is comparatively easy to be build but its high level of similarity to the real aircraft, together with the small dimensions of the model require special attention and high precision during the assembly process. Study carefully the illustrative drawings, cutouts and present instruction before starting the work on the model. Try to imagine the separate assembly phases and the purpose of each detail. After the acquaintance with the model, you may start the assemblage. Follow the sequence given in the instruction. Cut the necessary details shortly before using them in order to avoid possible mistakes. Score all fold lines before cutting the details. The places of scoring are marked with small thin lines on the continuation of fold lines outside the parts. Try to follow the middle of the outlines during the cutting of the parts. Do not be in a hurry with gluing - carefully check and shape each detail until obtaining the exact form for correct fit. Before starting the work get hold of the necessary tools: scissors, sharp modeling knife, blunt knife for scoring the fold lines, prickle, ruler, nippers and grinding paper. Additional materials necessary for the assemblage are: sheet of cardboard with thickness approximately 0.5 mm, a piece of wire with diameter 0.5 - 0.8 mm. Supply with proper glue. BISON Clear Adhesive, UHU or similar are recommended as the most appropriate ones. Water based glue is not recommended. Preparation for assembling includes gluing page 4 that contains formers and strengthening elements on a cardboard. Note that if you prefer to work with thin paper connecting stripes, you’ll have to print the page 2 one more time on normal 80 g/m2 paper. Start with the cockpit as it is shown on the view A and B. Be very careful with gluing the canopy frame 6 and wings holder / sealing of the cockpit 1-5 to the transparent parts 6t. Carefully shape the subassembly and don’t leave messing with glue. The transparent windows of the cockpit should be crystal clear. Glue the interior areas of the cockpit doors 6a and 6b leaving 2 mm free spaces to the bottom and sides of the doors. On these places the interior cover of the central fuselage segment will be glued later. Continue with the interior – pilot’s and observer’s seats, flying controls and the instrument panel as it can be seen on the views C. Then assemble the central fuselage segment shown on view D. Complete the fuselage subassembly preparations with building its rear part /view E/. After preparing the sub assemblages needed, you can complete the fuselage, following view F. Please note the following: Each subassembly view shows the parts or sub subassemblies needed, but not the final result. As a rule the completed subassembly can be seen somewhere in the next views of the instruction drawings. So you can refer to view F in this case to receive some impression how the fuselage subassemblies should look like. The same holds true to the fuselage itself. Just look forward at the View K to see it completed. Now go to the wings and the tail surfaces - horizontal and vertical stabilizers. You can choose integrated or separate control surfaces – ailerons, flaps, rudder and elevator. In case of separate control surfaces choice, cut the unnecessary areas following the middle of the lines, marked with red scissors sign.
Assemble also the engine compartment together with the propeller /View J/. The propeller sould be capable to rotate freeing its bearing formed by parts 42 f, h and 42g, where the axe 46m should be inserted and axial fixed with the delimiter 51. Complete the view F works with building the main wheels 55 together with 56 and 58 fixations, optional undercarriage cowlings 57, 58, wing legs cowlings 52, 53, tail wheel parts 59, 60 and the wing support parts 61, 62. The view I6 shows the result of the assemblage till now as it should look like, plus some details like JPS, CELL and USW antenna masts plus cargo compartment equipped with caneras . Enjoy…
Page 1
1/32 Scale DAR-21 VECTOR II www.aeroplanesdar.com
ASSEMBLY INSTRUCTION
A
B
1b 6ta
6t
1a 1
5
6, 6a 6b
3 3a
A 2
4a
4
C
7
8
7b 8b
10
8a
9 7a
This kit is designed by using
CadPoint Ltd. www.cadpointbg.com
www.cardmodels.co.il
Ml . PM
C 2008 E. ZARKOV
Page 2
1/32 Scale DAR-21 VECTOR II
ASSEMBLY INSTRUCTION
www.aeroplanesdar.com
D
18a
18
17
13b
16
13 14
13a
15m
15a
12e
12d
12f
E
11c
11a
11
11b
This kit is designed by using
12g
CadPoint Ltd. www.cadpointbg.com
12c
12b
12a
12
www.cardmodels.co.il
Ml . PM
C 2008 E. ZARKOV
Page 3
1/32 Scale DAR-21 VECTOR II
ASSEMBLY INSTRUCTION
www.aeroplanesdar.com
21
21a
20
F
20a
B
C
E
19
D
G
27
33-33c
23c
29
31-31c
30-30c
28
32-32c
22c
25,25b
23b
23
This kit is designed by using
23a
22a
CadPoint Ltd. www.cadpointbg.com
24-24b
22
26
22b
www.cardmodels.co.il
Ml . PM
C 2008 E. ZARKOV
Page 4
1/32 Scale DAR-21 VECTOR II
ASSEMBLY INSTRUCTION
www.aeroplanesdar.com
I
H
37
36-36c
34a
34
35
49
J
48-48a
40b
34b
50-50a
47c
47-47b
This kit is designed by using
46c
CadPoint Ltd. www.cadpointbg.com
38
40
37-37e
46d
38c
46m
46-46b
42i
45
42h
42f
41-41e
38a
38b
42-42e
40a
42g
43
39
51
44
www.cardmodels.co.il
Ml . PM
C 2008 E. ZARKOV
K
www.aeroplanesdar.com
61-61a
J
G
53-53a
55
56
58-58g
57-57g
ASSEMBLY INSTRUCTION
54
62-62a
G
Page 5
H
I
59
60-60a
F
Ml . PM
www.cadpointbg.com
1/32 Scale DAR-21 VECTOR II
52-52a
C 2008 E. ZARKOV
www.cardmodels.co.il
CadPoint Ltd.
This kit is designed by using
L www.aeroplanesdar.com
K
66
63
66a,b 65 65d 65f 67a,b 67
1/32 Scale DAR-21 VECTOR II
64
65c 65e 65a,b
68-68b
Page 6
This kit is designed by using
CadPoint Ltd. www.cadpointbg.com
www.cardmodels.co.il
Ml . PM
C 2008 E. ZARKOV
Page 7
DAR-21 VECTOR II
DIGITAL VIEWS 2008 Tony Iliev, Airplanes DAR Ltd.
www.aeroplanesdar.com
This kit is designed by using
CadPoint Ltd. www.cadpointbg.com
www.cardmodels.co.il
Ml . PM
C 2008 E. ZARKOV
50
150
100
OT P USH
DO NOT PUSH
DO N
DO
NO
TP
US
DO NO TP US H
H
USH
DO N
OT P
36b
DO NOT PUSH
37
37e
40
50
40a
41d
37d
41e
40b
LIF TH ER E
6a
60 CK
LO
LO
CK
100
100
6b
LIFT HE RE
50
36
60a
6
DO NOT STEP
62 DO NOT STEP
61
12
150
150
64
21a
21
2.2 atm
2.2 atm
57
20
20a
63
58
57g 58g
52
53
43
19 27 42
200
200
26
17
LLER
PROPE
PROPE LLER
45
42h
www.aeroplanesdar.com This kit is designed by using www.cadpointbg.com
PRINT THIS PAGE ON 160 g/m 2 CARD
44
42i
1/32 Scale DAR-21 VECTOR II CadPoint Ltd.
PAGE 1 www.cardmodels.co.il
Ml . PM
C 2008 E. ZARKOV
50
150
100
www.aeroplanesdar.com
9
7a
16
50
50
10
11 8a
50
50a
18a 11a
46
100
100
12c 49 47 12b 48 12g
8 4a
3a
42a
36a
7b
150
8b 13b
42b 42d
42c 57e
150
7
25b
24b
13a 58e
57d
58d
42e 12d
46b
58c
46a
57b
58b
57c 15a
47a
200
200
47b 48a 57a
37a 62a
58a
41a
61a 30a
12a
32a
24a
52a 25a
53a 31a
1/32 Scale DAR-21 VECTOR II CadPoint Ltd.
This kit is designed by using www.cadpointbg.com
PRINT THIS PAGE ON 160 g/m 2 CARD
33a www.cardmodels.co.il
Ml . PM
PAGE 2 C 2008 E. ZARKOV
50
150
100
30 DO NOT PUSH
www.aeroplanesdar.com
35
29 DO NOT PUSH
32
50
DO NOT PUSH
50
37
DO NOT PUSH
33
31 DO NOT PUSH
24 100
100 MIXTURE A95+0.2% OIL
FUEL
39
DO NOT PUSH
150
28
150
DO NOT PUSH
41
25
DO NOT PUSH
200
DO NOT PUSH MIXTURE A95+0.2% OIL
FUEL
200
DO NOT PUSH
1/32 Scale DAR-21 VECTOR II CadPoint Ltd.
This kit is designed by using www.cadpointbg.com
PRINT THIS PAGE ON 160 g/m 2 CARD
PAGE 3 www.cardmodels.co.il
Ml . PM
C 2008 E. ZARKOV
50
150
100
22
50
22a
23a
22b
23b
50
23
22c 23c
37b
30b
37c 34b
30c
36c 34a 38a
38b
41b
41c
33c
32b 31c
1
32c 1a
33b
31b
1b
38c
4
100
100
3
38 2 34 58f
57f 18
42f
51
5
150
150
59
14
42g
56
56 65c
54
11c
13
47c
46d
54
65d
46c
200
200
12e
12f
55
11b
Glue this page on 0.5 mm heavy card www.aeroplanesdar.com This kit is designed by using www.cadpointbg.com
PRINT THIS PAGE ON 160 g/m 2 CARD
1/32 Scale DAR-21 VECTOR II CadPoint Ltd.
PAGE 4 www.cardmodels.co.il
Ml . PM
C 2008 E. ZARKOV
50
150
100
15m Front View
50
50
15m Side View
15m Izometric View
15m Top View
100
100
15m Bend Here
Make this parts from 0.6 mm metal wire
STENCILS FOR WIRE METAL WIRE PARTS
150
150
45m
65a 66a
65c
67a
65d
65 OPTICAL EQUIPMENT HANDLE WITH CARE
67
66
68b
200
200
68a
68
HANDLE WITH CARE OPTICAL EQUIPMENT
66b 65b
www.aeroplanesdar.com This kit is designed by using www.cadpointbg.com
PRINT THIS PAGE ON 160 g/m 2 CARD
67b
1/32 Scale DAR-21 VECTOR II CadPoint Ltd.
PAGE 5 www.cardmodels.co.il
Ml . PM
C 2008 E. ZARKOV
50
150
100
TRANSPARENT PARTS
WARNING
50
50
USE ONLY TERMOPROOF SPECIAL TRANSPARENT FOIL FOR LASER PRINTING OF THIS PAGE USING UNAPROPRIATE MATERIAL CAN BADLY DAMAGE YOUR LASER PRINTER!
2008 E. ZARKOV www.aeroplanesdar.com
6t1
100
100
6t
TRANSPARENT PARTS
150
150
1/32 Scale DAR-21 VECTOR II
2008 E. ZARKOV www.aeroplanesdar.com
200
200
6t1
6t
1/32 Scale DAR-21 VECTOR II
TRANSPARENT PARTS PAGE 6
This kit is designed by using
CadPoint Ltd. www.cadpointbg.com
PRINT THIS PAGE ON TRANSPARENT FOIL
www.cardmodels.co.il
Ml . PM
C 2008 E. ZARKOV
Presentation of “Aeroplanes DAR” Ltd
PRESENTATION of “Aeroplanes DAR” Ltd
“AEROPLANES DAR” LTD
Headquarter: 5, Persenk Str, Bankya, 1320 Sofia, Mail address: Mladost 103-A-49, 1797 Sofia, Bulgaria Contact phone: +359 888 226 445 Fax: +359 28 70 38 93 E-mail:
[email protected] Web site: http://www.aeroplanesdar.com
Page 1
Presentation of “Aeroplanes DAR” Ltd
CONTENTS page 3
Introduction Company profile
4
Short history
4
Presentation of DAR-21 and DAR Speedster airplanes
11
Description of the DAR-21
12
Description of the DAR Speedster
14
Presentation of DAR-23 airplanes
15
Description of the DAR-23
15
Presentation of DAR-241 airplanes
17
Description of the DAR-241
17
DAR Airplanes Applications
19
Agricultural Version
19
Courier Version
21
Specilized Police Airctaft
22
Page 2
Presentation of “Aeroplanes DAR” Ltd
INTRODUCTION This booklet, published by the "Aeroplanes DAR" Company Ltd, presents products - DAR-21, DAR Speedster, DAR-23 and DAR-25 a line of light two-seater airplanes. The gamma of airplanes is completed with new four seat twin engine DAR-241. It shows some of its applications and perspectives. Here you will find the prerequisites for the creation of the product, as well as its implementation in technical, industrial, ecological and political aspects. As a pilot-flown aircraft DAR is a highly-technological product. The intellectual potential ("know-how") invested in this product is unique and goes beyond assessment. The following facts must be well-remembered: DAR-21 is the first all-metal aircraft built in Bulgaria. This is the first procedure of the Civil Aviation Authorities considering an airplane designed and built in Bulgaria and the first issued Airworthiness Certificate for a fully designed and built in Bulgaria airplane by Bulgarian Civil Aviation Authorities.
Page 3
Presentation of “Aeroplanes DAR” Ltd
COMPANY PROFILE Founder of the "Aeroplanes DAR" Company Ltd is Tony Dencheff Ilieff, Eng. Main activities as per Court’s Resolution: - Production and servicing of aviation equipment, materials and spare parts; - Sport and commercial aviation; - Commercial activity home and abroad; - Commercial mediation; - Representation and agency of Bulgarian and foreign companies home and abroad.
SHORT HISTORY In the autumn of 1995 the few engineers with Tony Ilieff ahead started to work on a series of projects of light two-seat airplanes. Their aim was to work out a model to be produced in Bulgaria. In 1996 the DAR-11 project was launched. With a view to a better economical and maximum effective spending of the limited resources (time and financial funds) the technical project was worked out sticking to practiceproven classic solutions. Many technological checks were done. The body of the airplane was built as a frame construction - out of thin-walled seamless steel tubes. The Page 4
Presentation of “Aeroplanes DAR” Ltd
main wing elements were made of wood. After an accurate technical and economical analysis of the opportunities offered by the already tested technological solutions for achieving the final goal - maximum technological and suitable for line production airplane construction, we decided to change the technological approach.
In May 1998 the DAR-21 project was launched. There was no need to use different (both in character and level of complexity) technologies. At the beginning of June the prototype (a trial version) of DAR-21 was put into effect.
On 1st of April 1999 the prototype passed the strength static tests with flying colors. On 22nd February 2000 the registration Page 5
Presentation of “Aeroplanes DAR” Ltd
procedure of DAR-21 airplane started. At that time there was no corresponding data base in the official documentation of R.Bulgaria. So the Ministry of Transport and Communications (MTC) set up a committee with representatives of the MTC, of the Technical University – Sofia, Aviation Department (TU) and of the "DAR" Ltd. This committee worked out requirements for creating experimental aeronautical vehicles with a weight up to 1000 kg. On the basis of these requirements the CAA Director-General issued an Order for appointing a technical committee with representatives of the MTC and TU which inspected DAR-21 and its documents and gave permission for carrying out the flying tests. On 28.06.2000, after the committee inspection, a Registration Certificate was issued.
A test pilot was trained and approved by the MTC according to the prepared by the "DAR" Ltd Company programs for flying tests. The flying tests were authorized by the CAA Director-General with Order No. 45-01-67/31.07.2000 to be performed on the premises of the Bojuriste Airfield. The Order for flying tests got ahead of the Regulations publishing with more than 6 months. The conducted flying tests started on 01.08.2000 and ended on 25.08.2000 - 105 flights were operated totaling 41 hours and 10 minutes. All fulfilled exercises and results were recorded in the protocols of the Page 6
Presentation of “Aeroplanes DAR” Ltd
flying tests. These protocols were submitted to the CAA on 04.09.2000 and this was the end of the test programme. The results of the flying tests beat all expectations. DAR-21 laid not only the technological foundations but also the administrative ones for that type of aviation in Bulgaria.
DAR-21 is the first all-metal airplane constructed in Bulgaria. This is the first CAA procedure considering an airplane designed and constructed in Bulgaria as well. All airplanes produced in Bulgaria were constructed by the military forces and never used in civil aviation. On January 18th 2001 the CAA Director-General issued the final Airworthiness Certificate No. II-1. That act brought to an end the legalization of DAR-21 airplane.
Page 7
Presentation of “Aeroplanes DAR” Ltd
"DAR" Co. Ltd prepared 15 books (instructions and descriptions) and 26 documents (letters, protocols, etc.), while the CAA issued 30 different documents (orders, reports, letters, certificates, etc.). This is indicative of the enormous work done by the two teams - that of the DAR company and the CAA one. The maiden flight of the airplane was on the second aviation show "Flight for everyone 2000" organized by AOPA Bulgaria, hold on September, 30th 2000 at the Bojuriste Airfield. The airplane operated several demonstrative flights including a demonstration with the agrochemical system those were the first flights viewed by spectators. On February, 28th 2001, the Agency for small and average business awarded the special prize for “The Product of the year 2000” and “The Project of the Year 2000” to the DAR-21 airplane.
Page 8
Presentation of “Aeroplanes DAR” Ltd
In December 2000 “DAR” LTD started to work on the new models DAR-23 and DAR-23 enclosed. It was worked out mainly as a training airplane for basic training. The DAR-23 prototype was completed in August 2001 and was transported to the Bojuriste Airfield. On August, 23rd, 2001 the registration procedure of the airplane started. The DAR-23 enclosed prototype was completed in May 2002 and joined flying tests.
Page 9
Presentation of “Aeroplanes DAR” Ltd
The DAR-23 and DAR-23 enclosed airplanes are perfect for primary training of pilots. It are light and easy to operate – its stable “conduct” reassures beginners. The airplanes flies in a steady and stable manner even without power. Controlling the nose wheel provides a very precise ground operation (taxiing, taking-off and landing). The main scheme of the wheel carriers guarantees gentle landings but allows hard ones, too.
Page 10
Presentation of “Aeroplanes DAR” Ltd
Developing continue with bigger version of DAR-21 the DAR21 S. This aircraft start producing for French market.
Demostration airplanes with reagistration Nos and LZ-DAP (DAR-21) are based on the Kalimanci Airfield (Varna), LZ-DAF and LZ-DAH (DAR-23) are based on the Bojuriste Airfield (Sofia). On summer 2006 start developing new four seat, twin engine airplane DAR-241. The expected performance give seriouse advantage against all competitors on the market
Page 11
Presentation of “Aeroplanes DAR” Ltd
PRESENTATION OF DAR-21 “Vector” AND DAR “VectorII” / “Speedster” AIRPLANES The aim of DAR-21 project of the "DAR" Co. Ltd is to work out the technical documentation of a light two-seater, singleengine airplane, to build a trial sample, to test and certify that sample, and, in the long run, to organize its line production. The product cycle is planned to be a closed one and done here, in Bulgaria. Two main market versions are envisaged for its line production - an airplane "Ready to fly" and a set of airplane parts to be put together on one’s own at home, the so called "Homebuilt aircraft kit". As a result DAR-21 is not just the first Bulgarian airplane to be put together on one’s own even by amateurs, but it is also a unique product on the East-European aviation market.
The main function of DAR-21 airplane is to be used for sport, tourist and training flights. This airplane could be used with additional equipment for agrochemical treatment of agricultural crops, for transport and courier services, for advertisement flights, etc. All necessary prerequisites for gaining wide currency and turning into a popular "Experimental class" plane have been set in the work-out of DAR-21 technical project.
Page 12
Presentation of “Aeroplanes DAR” Ltd
The main aim of the Company is appearance and presence on the aviation market of former USSR countries as well as an attempt for a break-through in the North-American market.
DESCRIPTION OF THE DAR-21”Vector” DAR-21 airplane is a two-seat tandem with a ROTAX 582 UL DCDI engine (65 HP) with an electric starter. Aluminum alloys 1050 and 3105 are used as basic building materials. The welded metal parts are made of low carbonic structure steel St20, while turnery and milling parts are of structure steel St45.
The cabin is fully closed with tandem seats. There is a big door on the right side giving access to seats and cargo sector. The cabin is equipped with all necessary navigation and engine control instruments set in one panel in front of the first seat. The control system is double and allows flying both from front and rear pilot seats. The wing is rectangular with one spar construction supported by two spurts. In order to better the take-off and landing characteristics the wing is powered with flaps deflecting at 15° during take-off and at 30° on landing. Steel cables control ailerons and vertical rudder while elevator is controlled by push-pull tube traction. All control panels are equipped with trimmers. The fuselage is quadrangular, upside rounded. It is made of quadrate tubes and shaped metals over which a supported Page 13
Presentation of “Aeroplanes DAR” Ltd
aluminum sheet is mounted. The engine capote is made of composite materials. The landing gear is of pyramidal type, with a rubber damping. The two main wheels are equipped with mechanical brakes while the tail wheel is controllable.
The engine frame is a construction made of welded steel tubes. The fuel tank is situated in front of the cabin and its volume is 30 liters. Fuel flow is secured by a fuel pump. The empty weight of the plane is 250 kg, while the MTOW is 450 kg. A cargo sector for 10 kg personal luggage is set behind the second pilot seat.
Page 14
Presentation of “Aeroplanes DAR” Ltd
Page 15
Presentation of “Aeroplanes DAR” Ltd
DESCRIPTION OF THE DAR “Vector II” / “SpeedSter” The new DAR airplane is a two-seat tandem with a ROTAX 912 UL engine (80 HP) or line of different 80-100 HP engines. The name “SpeedSter” was choosed for US market, for local EU market continued using name “Vector II”. Aluminum alloys 6061 and 2024 are used as basic building materials. The welded metal parts are made of low carbonic structure steel St20, while turnery and milling parts are of structure steel St45. The cabin is same as DAR-21 but bigger and wider. The wing and the fuselage are 10% longer than DAR-21. The landing gear is aluminum spring with hydraulic brakes on wheels. The engine frame is a construction made of welded steel tubes. The fuel tanks are situated in wings and its total volume is 60 liters. Fuel flow is secured by a fuel valve and pump. The empty weight of the plane is 260 kg, while the MTOW is 450 kg.
Page 16
Presentation of “Aeroplanes DAR” Ltd
PRESENTATION OF DAR-23 AIRPLANE These ultralight airplanes was developed with idea to be simple, polular and low cost airplane for basic training. The maitenace of these airplanes is quite simple and not pretentios. In flight airplane not show high performance, but to fling is easy, calme and secure, something very important for begginers.
DESCRIPTION OF THE DAR-23 DAR-23 airplanes are a two-seat side by side with a ROTAX 503 UL DCDI engine (50 HP) or ROTAX 582 UL DCDI engine (65 HP) with an electric starter.
Aluminum alloys 1050, 2024 and 3105 are used as basic building materials. The welded metal parts are made of low carbonic structure steel St20, while turnery and milling parts are of structure steel St45.
Page 17
Presentation of “Aeroplanes DAR” Ltd
The fuselage is schematic. The base tube is prepared from quadrate strengthen tube. The cabin is mounted under base tube by six aluminum tubes. The engine is mounted in front of base tube The cabin is open for DAR-23. The DAR-23 enclosed is fully closed, there are doors on each side giving access to seats. The instrument panel has standard VFR aero navigation and engine control instruments. Operating is double with possibility to control the aircraft from both seats.
The wing is rectangular with one spar construction supported by spurt over 50% from spread of half wing. The location of rudders is standard. The flaps deflect at three positions 0°, 20°, 40° and 60°. The control of ailerons and elevator is with push-pull cables. For the operation of rudder are used classic steel cables. The controlled trim over the elevator is controlled by electric system. The landing gear is pyramidal type with elastic cord over ever inside spurt. The wheels are aluminum minimum 6 inches Page 18
Presentation of “Aeroplanes DAR” Ltd
in diameter (max. 8 inches) completed with mechanic drum brakes, inner tubes and tires. The nose wheel is connected and operated with the vertical rudder. The tank is in rear part of cockpit (behind seats) with volume 22 litter. The flow of fuel is secured by fuel pump. MTOW of DAR-23 is 380 kg empty weight 195 kg. MTOW of DAR-23 enclosed is 400 kg empty weight 215 kg.
PRESENTATION OF DAR-241 AIRPLANE This airplane was developed under practical requirements by the customers. As all other airplanes by “Aeroplanes DAR” Co. Ltd, this new project continues the idea for simple, polular and low cost airplane for cross country distances. The maitenace is quite simple and not pretentios. In flight airplane show high performance, flying is easy, calme and secure, something very important for long distance flights. Twin engine schema gives the high level of safety.
DESCRIPTION OF THE DAR-241 DAR-241 airplanes are a four-seat with two ROTAX 912S engine (100 HP) or Subaru EA-82 engine (115 HP).
Page 19
Presentation of “Aeroplanes DAR” Ltd
All metal construction based on aluminum alloys 6061 and 2024. The cabin is car type, with large doors from each side. Cabin is wide 120 mm, with excellent panoramic view. The cargo compartments are two, one in nose section and one after rear seat. Belly container is provided as extra equipment to increase the cargo capacity. The engines are mounted on wings, between rip sections 3 and 4. The propellers are on ground adjustable, but as option are in flight pitch control. The instrument panel has standard VFR aero navigation and engine control instruments. Operating is double with possibility to control the aircraft from both front seats. Intercom is with four position with head set, for each passenger.
The wing is rectangular with one spar construction supported by spurt over 50% from spread of half wing. The location of rudders is standard. The flaps deflect at three positions 0°, 15° and 30°. The control of ailerons and elevator is with push-pull cables. For the operation of rudder are used classic steel cables. The controlled trim over the elevator is controlled by electric system. The landing gear is alum spring. The wheels are aluminum minimum 6 inches in diameter (max. 8 inches) completed with hydraulic disk brakes, inner tubes and tires. The tail wheel is connected and operated with the vertical rudder. Page 20
Presentation of “Aeroplanes DAR” Ltd
The tanks are in wings with volume 35 litter. The flow of fuel is secured by fuel pump. MTOW of DAR-241 is 850 kg.
DAR AIRPLANES SPECIAL AICRAFT AND APPLICATIONS AGRICULTURAL The Specialized Agricultural Aircraft provides a possibility to choose chemical equipment. Spray systems come in two types: with a rotary atomizer or a direct one. These systems are produced by several companies American, English, Russian and Ukrainian. Each system has very good specifications for area coverage and fragmentation of crop treatment preparation. There are two big advantages in using such spray systems:
Page 21
Presentation of “Aeroplanes DAR” Ltd
High ecological factor - the high pulverization level of the substance provides better absorption by plants and gives a chance to a very precise dosage and avoidance of surplus amounts. Low speed and spray height ensure exact crop treatment - surrounding area being not affected by scattered, drifted or inaccurately released substance. Low price - the production costs of aerial application of such a system mounted on DAR AGRAR aircraft starts from $ 0.45 per hectare. This price makes the combination of DARAGRAR and the spray system an indisputable leader in agrochemical activities in Bulgaria.
Page 22
Presentation of “Aeroplanes DAR” Ltd
The disadvantage of these systems - not being able to treat vast areas (about 1000 hectares) - turns into a great advantage in Bulgaria. It is well-known that such areas do not exist in Bulgaria. The aircraft is easily operated and no special runway is needed - thus there is a chance the aircraft to be in immediate proximity to treated crops every day. AG System can be installed on other airplanes from DAR family.
Page 23
Presentation of “Aeroplanes DAR” Ltd
COURIER VERSION A courier Company wants to operate light aircraft between big towns in Bulgaria. The load flow and distance analysis determined the parameters of the modified aircraft version for cruise flights. The aircraft will be equipped with a more powerful engine and will ensure an average speed of 200 km/h and a load factor of 200 kg. By operating such aircraft the company desires to offer better courier services when it comes to time, namely to introduce the so called "same day delivery" to Bulgaria. Thus a better service could be offered on the courier service market. DAR-21 Courier gives advantages not only in time but also in price. The company would pay operating costs of the aircraft 0.08EUR/km against 0.6EUR/km by car (calculation is done for Peugeot Partner).
Page 24
Presentation of “Aeroplanes DAR” Ltd
SPECILIZED POLICE AIRCTAFT DAR Aeroplanes develop a series of airplanes for specific police work.
The different model cover all necessary needs as highway patrol, coast guard, border police, fire brigades and gendarmerie.
Page 25
Presentation of “Aeroplanes DAR” Ltd
The airplanes are practical for using and the lowest operation and maintainace cost make it very attractive. DAR Police airplanes give advantages not only in time but also in price. The lowest expenses will give opportunity to Police to have several airplanes in position “Ready to action” on different regions of the country
Page 26